PERFECT FOR SMALL RESIDENTIAL JOBS, U- CART CONCRETE CAN BE BATCHED FROM ¼ YARD TO 1 ¼ YARD CARTS. 6 BAG MIX ONLY.
REQUIREMENTS FOR RENTAL
- VALID DRIVERS LICENSE
- MAJOR CREDIT CARD
- 2” BALL HITCH OR PINTLE HITCH
TERMS OF RENTAL
- 2 HOUR RENTAL
- $20.00 PER HOUR LATE CHARGE
- $75.00 PER HOUR LATE CHARGE FOR TRAILERS RETURNED AFTER REGULAR BUSINESS HOURS
- $50.00 MINIMUM CLEANING CHARGE IF TRAILER IS RETURNED DIRTY.
- DAMAGE TO TRAILER IS CUSTOMER RESPONSIBILITY
- NO CONCRETE DUMPING. IF EXCESS CONCRETE IS RETURNED WITH TRAILER, DALE’S HAS THE RIGHT TO ASSESS ADDITIONAL DUMPING CHARGES AND CLEANING CHARGES.
HOW TO FIGURE CONCRETE
SQUARE FOOTAGE OF AREA DIVIDED BY SQUARE FEET COVERED BY 1 YARD. YOUR ANSWER WILL YIELD HOW MANY YARDS NEEDED TO COVER AN AREA.
NOTE: CONCRETE BATCHING IS ONLY DONE IN ¼ YARD INCREMENTS. IF FOR EXAMPLE YOU NEED 0.63 YARDS OF CONCRETE, YOU WILL HAVE TO ORDER ¾ OF A YARD.
SQUARE FOOTAGE OF RECTANGLE = LENGTH X WIDTH
SQUARE FOOTAGE OF CIRCLE = RADIUS X RADIUS X 3.14
RADIUS OF A CIRCLE = DIAMETER/2
SLAB CONFIGURATIONS
DEPTH | DIVIDE SQUARE |
---|---|
- | FOOTAGE BY |
4” | 80 |
5” | 65 |
6” | 54 |
8” | 40 |
10” | 32 |
12” | 27 |
¼ YARD
6 BAG MIX
CONCRETE SLAB CONFIGURATIONS FOR ¼ YARD
DEPTH OF SLAB | SQUARE FOOTAGE COVERAGE |
---|---|
4” | 20 |
5” | 16.25 |
6” | 13.5 |
8” | 10 |
10” | 8 |
12” | 6.75 |
½ YARD
CONCRETE SLAB CONFIGURATIONS FOR ½ YARD
DEPTH OF SLAB | SQUARE FOOTAGE COVERAGE |
---|---|
4” | 40 |
5” | 32.5 |
6” | 27 |
8” | 20 |
10” | 16 |
12” | 13.5 |
¾ YARD
CONCRETE SLAB CONFIGURATIONS FOR ¾ YARD
DEPTH OF SLAB | SQUARE FOOTAGE COVERAGE |
---|---|
4” | 60 |
5” | 48.75 |
6” | 40.5 |
8” | 30 |
10” | 24 |
12” | 20.25 |
1 YARD
CONCRETE SLAB CONFIGURATIONS FOR 1 YARD
DEPTH OF SLAB | SQUARE FOOTAGE COVERAGE |
---|---|
4” | 80 |
5” | 65 |
6” | 54 |
8” | 40 |
10” | 32 |
12” | 27 |
1¼ YARD
CONCRETE SLAB CONFIGURATIONS FOR 1¼ YARD
DEPTH OF SLAB | SQUARE FOOTAGE COVERAGE |
---|---|
4” | 100 |
5” | 81.25 |
6” | 67.5 |
8” | 50 |
10” | 40 |
12” | 33.75 |